On June 16, 1998 The National Aeronautics and Space Administration
(NASA) presented Electron Beam Engineering, Inc. with The Group Achievement Award for Cassini Ion and Neutral Mass
Spectrometer (INMS) and Huygens Probe Gas Chromatograph Mass Spectrometer (GCMS) Experiment Team .
|

The Award
Click for larger picture
|

The device they electron Beam
Welded
Click for larger
picture
|
|
|
 |
In Source Housing Cover (Ti6Al4V)
Showing six ion source manifolds on both sides of cover after Electron
Beam welding was done on each bottom plate
. . . . Cassini/Huggons GCMS
Photo courtesy of NASA
|
|
Analyzer Housing showing 3-9 pin header assembly after Electron Beam welding. Header is twenty-one
inches long by seven inches wide.
55.304 to Incord X750.
Photo courtesy of NASA
|
 |
|
|
Kennedy Space Center, Florida 10/15/97
A seven year journey to the ringed planet Saturn begins with the liftoff of a Titan IVB/Centaur carrying the CASSINI
orbiter and its attached Huygens probe. Launch occurred at 4:43 AM, EDT October 15, 1997 from launch complex 40
on Cape Canaveral Air Station. (OP. NO. A0454)
Photo courtesy of NASA
|
|
National Aeronautics and
Space Administration
Goddard Space Flight Center
Greenbelt, MD 20771
Letter of recognition
|
 |